Abstract
In a construction production, management of various kinds of parts/units under corroboration project with various conditions such as status, position, attributes, construction order, delivery order, and so on. That makes difficult to grasps and manages construction projects by traditional production systems. In this study, details of actual construction processes management are found by listening comprehension for a general conductor and a parts/units maker. Then demands in construction process management are extracted. From these results, architecture and process flow of construction management system is proposed by using RFID.