The Proceedings of Manufacturing Systems Division Conference
Online ISSN : 2424-3108
2010
Session ID : 308
Conference information
308 Lead-time minimization in the integrated oroduction planning and scheduling environment
Toru EGUCHIShinji HIRANO
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
This paper deals with an integrated management method of production planning and scheduling to minimize the lead-time of jobs in the constraints of meeting due-dates. This method uses backward/forward scheduling simulation to determine the release times of jobs in production planning level. Numerical experiments with consideration to processing time uncertainty are used to examine the effectiveness of the methods.
Content from these authors
© 2010 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top