The Proceedings of Manufacturing Systems Division Conference
Online ISSN : 2424-3108
2013
Session ID : 303
Conference information
303 Scheduling to meet due dates with capacity adjustment : An efficient search method using the mixture of GA and priority rule and its performance evaluation using Lagrangian relaxation method
Toru EGUCHIYusuke YAMAMOTOMitsunobu YODATakeshi MURAYAMA
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
We have already proposed a job shop scheduling method to meet due-dates and to minimize overtime as far as possible. The sequence of operations of jobs is determined using the mixture of genetic algorithm and priority rule. In this report, we evaluate the performance of the proposed method by comparing it with lower bounds solved using a Lagrangian relaxation method. Numerical experiments show that the performance of the proposed method depends on the scale of problem and resolution time.
Content from these authors
© 2013 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top