Abstract
This study aims at examining agile manufacturing to develop a high-efficiency lot progress scheduling method in semiconductor device manufacturing. Throughout the study, we propose a lot progress scheduling model that applies grouping and multi-agents with a focus on external and internal fluctuations. As one example of fluctuation while carrying out a certain plan, daily interruption of an express lot is considered. The concern in this situation is determining the problem-solving range between groups. We propose a one method for Re-lot assignment corresponding to the situation.