Crane scheduling in a single machine production system with multiple LIFO buffers
*Kiyoshi UenoYuki MaruiwaHajime MizuyamaShota Suginouchi
Author information
CONFERENCE PROCEEDINGS RESTRICTED ACCESS

Details
Abstract

The production system taken up in this research has a single machine and several LIFO buffers, and an operator moves jobs from a buffer to another or to the machine with a crane. Since the sequence of the jobs to be loaded to the machine and the relocations of them among the buffers are interrelated, these two decisions need to be addressed together with satisfying the due dates of the jobs and minimizing their setup times in a dynamic environment where long-term information on arriving jobs cannot be obtained in advance. Therefore, this research extracts scheduling logics for these tasks through a serious game, and evaluates their effects by simulation.

Content from these authors
© 2019 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top