Abstract
Now, about 80% of fossil power plants in Japan have been operated over 100,000 hours. From a viewpoint of reduction in power generation cost, however, such aged plants are required to extend their service life. Therefore, it is very important to assess their re-maining life accurately. This paper reviews the present and future situations of remaining life assessment for longer service of the aged fossil power plants.