Journal of the Society of Materials Engineering for Resources of Japan
Online ISSN : 1884-6610
Print ISSN : 0919-9853
ISSN-L : 0919-9853
Estimation of The Amount of Rock Pile by Using The Image Processing and Force Sensors and Task Planning of Shoveling based on The Three Dimensional Shape of Rock Pile
Hiroshi TAKAHASHIKatsuyuki YAMAZAKI
Author information
JOURNAL FREE ACCESS

1997 Volume 10 Issue 2 Pages 32-40

Details
Abstract
In the previous paper, we proposed the method to recognize the existence ofthe rock pile by use of the image and laser slit light. In this study, we proposethe method to estimate the amount of the rock pile by use of the image and forcesensors. In order to estimate the amount of the rock pile, three dimensionalmeasurement of the rock pile was carried out. Furthermore, in order to detectthe contour of the rock pile, the force sensors were used. In this experiment, two strain gauges were used as force sensors.
Several kinds of rock piles were made and the experiments to estimate theamount of the rock pile were conducted. By comparing the estimated valuesand the actual ones, it was confirmed that the method proposed here works well. Furthermore, the shoveling task was planned based on the three dimensionalshape of the rock pile.
Content from these authors
© The Society of Materials Engineering for Resources of JAPAN
Previous article Next article
feedback
Top