In this paper, we describe the peak cut by the brine type heat pump system with the thermal storage device. Selecting air-conditioning equipment according to the peak load at general housing leads to excessive equipment, which leads to increases in equipment cost and contract power capacity. We conducted an experiment that gives a cooling peak load to the ground source heat pump (rated 5 kW) pseudo system with the thermal storage device. As a result, that was able to supply 7 kW of cold heat for about 80 minutes. Therefore, the combination of the ground source system and the thermal storage device have the effect of reducing the equipment scale.