Journal of the Society of Materials Science, Japan
Online ISSN : 1880-7488
Print ISSN : 0514-5163
ISSN-L : 0514-5163
A Study on the Dimension Control for a Jet Grout Forepiling Reinforced by Steel Pipe
Tadashi NINOMIYAKoichi HANASAKIKazuhiko TSUKADATetsuharu YASUOKA
Author information
JOURNAL FREE ACCESS

1999 Volume 48 Issue 4 Pages 351-356

Details
Abstract
A horizontal jet grout forepiling method reinforced by steel pipe is one of the useful pre-supporting systems in excavating a tunnel in weak ground. However, the dimension of the grouted column forming forepiles has not been measured and controlled during the executing operation, though it is important to estimate its dimension for the quality assurance and cost management in tunnel construction.
In this paper two new methods for estimating the diameter of a grouted forepile are proposed; One is the indirect method by measuring and controlling the replacing rate of soil with the grouting material. Another is the direct method by measuring the electrical resistance of the grouted material along the forepile by means of an electrical potential technique.
Content from these authors
© by The Society of Materials Science, Japan
Previous article Next article
feedback
Top