2011 Volume 65 Issue 3 Pages 274-278
Necessary time of difficult steers of a decrease in construction according to a decrease in capital investment and a severe cost reduction demand, etc. aiming at the economic shrinkage period in the future is faced though the instrumentation work and meter maintenance industry grow up riding on the wave of economic development, get over time when Japanese economy is saturated, and came.
In this report, the idea is described as charge of the technology in the experience, the instrumentation maintenance of the instrumentation charge in the petrochemical facility, and the construction company and the health and safeties about a current problem as the construction company and the approach in the future, etc. based on the experience.