This paper is to report on a computer aided system for scheduling of shipbuilding work. This system covers a calculation of manpower allocation and an adjustment of shipbuilding schedule at very beginning stage of shipbuilding. The system is to control the scheduling in the manner of on-line conversation through character display between man and computer.