Transactions of the Japan Society of Mechanical Engineers Series C
Online ISSN : 1884-8354
Print ISSN : 0387-5024
A Design of Assembly Line with Distributed Operation Times : 1st Report, Optimal Cycle-Time for Maximizing the Expected Production Volume under the Float-Type Buffer Storage
Noriyuki NISHIYAMAHiroyuki NAGASAWA
Author information
JOURNAL FREE ACCESS

1980 Volume 46 Issue 404 Pages 450-457

Details
Abstract

[in Japanese]

Content from these authors
© The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top