Abstract
In this research, we compare the difference of JIT and TOC at three different CCR positions. The results show a clear difference between JIT and TOC and indicate which system would be better to apply or use at different CCR positions. The study also looks at the problems of JIT and suggests a solution as well. In addition, we prove mathematically why JIT and TOC require small lot-sizes.