2015 Volume 26 Issue 1 Pages 12-21
Kagoshima Prefecture constructs a closed system industrial waste control type landfill site based on public involvement : Japan′s largest such facility to date. The concept expects success within a limited time period through integration of reclamation pre-treatment (air injection and watering), reclamation management (early stabilized-type reclamation and monitoring) and reclamation after-treatment (air injection and oxidizer pouring). The site is based on the new multi-barrier concept.