Proceedings of the Annual Conference of Biomedical Fuzzy Systems Association
Online ISSN : 2424-2586
Print ISSN : 1345-1510
ISSN-L : 1345-1510
28
Conference information
Minimizing Maximum Completion Time in a Proportionate Flow Shop
Min-Yong LEE, Suk-Hun YOON
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages 157-158

Details
Abstract

In this paper, we consider the n-job, m-machine proportionate flow shop scheduling problem with one different machine, in which the objective is to minimize maximum completion time. Since the problem is NP-complete, local search methods may not provide solutions of good quality for large size problems. We apply a simulated annealing (SA) to find best solution. The performance of SA is compared with that of local search methods. Extensive experiments are conducted to show the performance of the proposed SA.

Content from these authors
© 2015 Biomedical Fuzzy Systems Association
Previous article Next article
feedback
Top