Beam Commissioning of KEKB Crab Cavity RF System
Kazunori AKAI
Author information
JOURNAL FREE ACCESS

2008 Volume 5 Issue 3 Pages 227-236

Details
Abstract

KEKB started the first crab crossing operation in February 2007 with two superconducting crab cavities. After four months operation dedicated for machine tuning, physics run with high-current beams resumed in October with the crab crossing. The crab cavities have been working stably for one and a half years. The crab cavity RF system, commissioning process and performance of the crab cavities with high-current beams are presented.