Abstract
A lot of liquefaction counter measure methods have been developed, which are methods improved the wide-ranging ground. In railway structures, which are line structures, it is not reasonable to apply those methods. In this paper, we propose a method improving limited to subgrade around pile foundation using chemical grouting method or deep mixing stabilization method. We confirmed the validity of the proposed method by model shaking tests.