Abstract
This study proposed a planning method of Industrial Symbiosis (IS) projects and an evaluation method to calculate LCCO2 of the project based on the theory of IS and the survey on Kawasaki eco-town. Secondly we planned four cases of IS projects utilizing the recycling cement facility in Kawasaki eco-town and estimated the amounts of LCCO2 in each case. The results of CO2 emission reduction were 36 thousands t-CO2/y (“actual situation”), 38 thousands t-CO2/y (“local industrial wastes recycling”) and 137 thousands t-CO2/y (“local industrial and general wastes recycling”) compared with “without any waste recycling (baseline)”