Proceedings of the Symposium on Global Environment
Online ISSN : 1884-8419
ISSN-L : 1347-510X
LIFECYCLE CO2 EMISSION AND COST OF RATIONALIZED BRIDGES
Saori TSUBOUCHIYoshito ITOHIn-tae KIM
Author information
JOURNAL FREE ACCESS

2004 Volume 12 Pages 107-112

Details
Abstract
The interest of the environmental problem has been increased world widely, and it is required to reduce the environmental impact. It is also recommended that civil engineers should pay attention to not only lifecycle cost (LCC) but also lifecycle environmental impact (LCCO2) of civil infrastructures. In this study, the LCCO2 of newly developed bridges, named the minimized girder, the rationalized box-girder and the rationalized truss bridge in Japan were calculated. The LCCO2 of the conventional bridges, I-girder, box-girder and truss bridges were also calculated and compared with that of the newly developed bridges. It was found from the estimation that the newly developed types of the bridges have less total LCCO2 than the corresponding conventional bridges. These reductions of whole LCCO2 of the bridge are resulted from the maintenance stage of the bridge.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top