Abstract
The dumping method of cubic blocks is investigated to optimize the construction works for artificial mound for occurrence of upwelling. In this method, four units of blocks are placed in a hopper and split barge, and two diagonal units are dumped in rotation. This paper presents the influence of number of block in a unit on deposition configuration of blocks and refers an acceptable dumping method in actual works.