Abstract
In order to ship ordered products based on ordered papers within due days, it is requested to control the logistic center effectively. We have proposed a new scheduling method on the order-picking problem in a large-scale logistic center based on 'Local Clustering Organization (LCO)'. This paper propose a re-active scheduling method possible to treat pre-schedule interruption by urgent orders. Moreover, we prove the effectiveness of the proposed method through numerical experiments.