2007 Volume 13 Pages 297-302
We proposed the estimation method of flood disaster loss with the probability of dike break. This method is able to estimate the flood disaster loss according to a form and a material of embankment. In other words, the flood loss with the characteristics of embankment and with the probability of dike break based on the resistance against the dike break, is able to be estimated by this model. Therefore, a more efficient flood control planning is expected by using this model.