Advances in River Engineering
Online ISSN : 2436-6714
ESTIMATED SEDIMENT PRODUCE CASED BY SLOPE FAILURE DUE TO CLIMATE CHANGE
Seiki KAWAGOEKeisuke ONOHaruna AOKI
Author information
JOURNAL FREE ACCESS

2010 Volume 16 Pages 77-82

Details
Abstract

We tried to evaluate basins sediment production in future by using GCM (General Circulation model) outputs and digital numerical information. Basins sediment production based calculation on slope failure probability model and sediment produce estimation model. The radius of sediment production is obtained by sediment produce estimation model using some GCM outputs and SRES (Special Report on Emissions Scenarios).

The results obtained are as follows; 1) Japan northern areas are estimated a lot of sediment production due to occurrence increase maximum daily extreme, 2) Sediment production increases remarkably by changing Future climate condition (2081-2100).

Content from these authors
© 2010 Japan Society of Civil Engineers
Previous article Next article
feedback
Top