Advances in River Engineering
Online ISSN : 2436-6714
CONSIDERATION AND PRACTICE ON INSTALLATION OF SLIT-TYPE FISHWAY MADE FROM EXISTING STRUCTURE
Kazufumi HAYASHIDAArimune MUNAKATAHiroki OHMIYAKeigo NAKAMURA
Author information
JOURNAL FREE ACCESS

2020 Volume 26 Pages 313-318

Details
Abstract

The objectives of this study was to improve construction cost, upstream migration efficiency, maintenance work when constructing and operating the fishway, because fishways were still needed for the fish to migrate upstream in various rivers (mainly, small and medium-sized). Although the construction of fishway has been ongoing for approximately 6 decades in Japan, there is room for further improvement in design of fishway. Therefore, we proposed to dig existing concrete structures like in-river barriers (e.g., headworks, weirs, or dams) to improve the above subjects. We considered for the shape of the slit and the safety of the structure, and constructed slit-type fishway in the Tatsunokuchi-valley in Sendai city. As a result, because to the slit-type fishway that was set up, the water head required for upstream migration of fish was secured at a low cost.

Content from these authors
© 2020 Japan Society of Civil Engineers
Previous article Next article
feedback
Top