Quarterly Report of RTRI
Online ISSN : 1880-1765
Print ISSN : 0033-9008
ISSN-L : 0033-9008
PAPERS
Modeling an Optimal Track Maintenance Schedule in Consideration of Timing of Grinding and Tamping
Mami MATSUMOTOMasashi MIWA
Author information
RESEARCH REPORT / TECHNICAL REPORT FREE ACCESS

2017 Volume 58 Issue 3 Pages 229-235

Details
Abstract

Today, tamping machines and rail grinding machines are used to maintain ballasted tracks and to remove rail surface irregularities, respectively. Even though maintenance cycles could be extended and the total cost of maintenance could be reduced by efficiently combining these two machines, they are usually operated independently. As such, in order to estimate the effect of combining both these machines (combined maintenance), a model has been designed along with a scheduling system, as a simple method for preparing maintenance schedules which combine tamping and grinding. Investigations were also carried out to establish how long this type of maintenance lasts, and determine the optimum level of combined maintenance.

Content from these authors
© 2017 by Railway Technical Research Institute
Previous article Next article
feedback
Top