Abstract
The behavior of the soft clay grounds subjected to repeated loading is different from that subjected to sustained loading. The difference in settlement between these two loading patterns should be due to secondary compression over a long period of time. Consequently, soft clay grounds subjected to repeated loading tend to be more compressible than those subjected to sustained loading. Therefore, it is necessary for engineers to predict post-construction settlements under repeated loading. In this respect, the preloading is considered to be promising as a countermeasure to reduce the settlement of clay under repeated loading as well as under sustained loading. The effect of preloading on post-construction consolidation settlement of soft clay subjected to repeated loading after removal of a part of preload is investigated in the present paper. It has become clear that the settlement of a clay sample after preconsolidation is mainly affected by the amount of preload, the degree of consolidation due to the preload, the amount of permanent load and the amount of repeated load after removal of preload. The calculated settlement versus time relations using a method to estimate the amount of consolidation settlement of soft clay grounds subjected to repeated loading after removal of preloading were compared with the observed degree of consolidation as parameters of the intensities of preload and repeated load.