2023 Volume 48 Issue 310 Pages 11-17
District heating and cooling plants (DHC) have potential adjustment capacity for a Virtual Power Plant (VPP) because they have a large number of heat sources and power generation equipment. This study proposes a demand response (DR) control method and a calculation method for the power supply by replacing an electric heat source unit with a gas heat source unit, thereby creating a multiple heat source system for DHC plants. In addition, a test demonstration of the proposed DR control operation was conducted, and the methodology and results of the test were reported. From the results of the winter test demonstration , it was confirmed that the DR can be implemented by shifting the heat load from an electric to a gas heat source unit.