Abstract
Load characteristic at the local general hospital through a year was examined. As the result of the measurement, it is found that the tendency of the electric, heating, cooling, hot-water supply loads and the quantity of them are somewhat different from one of the statistical data in literatures, caused by a change of hospital management, advanced building equipment system etc.