Techinical Papers of Annual Meeting the Society of Heating,Air-conditioning and Sanitary Engineers of Japan
Online ISSN : 2424-2179
Print ISSN : 1880-3806
ISSN-L : 1880-3806
2008.2
Session ID : B-48
Conference information
B-48 Study on Heat Source System in the Public Bath Facilities Using the Substation Waste Heat and the Public Bath Drain Water Heat
Yasuhiro SHOWAHiroshi TAMURARyouitsu TAKEYA
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
In the public bath facilities "Yudokoro-Hana Yuzuki", the system recovering the substation waste heat and public bath drain water heat as unutilized energy is adopted for hot water supply and snow melting. As a result of the evaluation based on the annual operating data, it was shown that the substation waste heat recovery efficiency was 38.2%, and that the quantity of the substation waste heat recovery and the quantity of the warm drain water heat recovery accounted for 17.0% and 18.2%, respectively, of the heat demand for hot water supply and snow melting.
Content from these authors
© 2008 The Society of Heating,Air-Conditioning&Sanitary Engineers of Japan
Previous article Next article
feedback
Top