Proceedings (National Conferences of The Society of Project Management)
2005.Spring
Session ID : 1104
Conference information

1104 A Proposal to Utilizing FTA to Project Risk Management
Yumi KusakabeShin-ichiro Yokoyama
Author information
CONFERENCE PROCEEDINGS OPEN ACCESS

Details
Abstract
Project has many uncertain things, in other words, risks. Therefore, risk management has an effect on the project success. Project risk has three essential factors: "Uncertainty", "Loss", and "Time Component". The term "Time Component" means risk have temporal. But, now, there is no tangible method for risk management to consider "Time Component". On the contrary, there is FTA (Fault Tree Analysis) that is one of reliability engineering methods. It is possible to clarify causal relation of breakdown systems for top-down method. In addition visually and deductive analysis is possible. And so, this paper proposed to utilize FTA to risk management. Concretely, procedure for making FT diagram at the same time as identify risk event, and method of utilizing FT diagram are proposed.
Content from these authors
© 2005 The Society of Project Managemen
Previous article Next article
feedback
Top