Abstract
In the network integration project, open systems and their open interconnection are used to realize the new network. This means that less program development is done compared with the application system development and different project management is needed for the network integration. In this paper, clarify the difference and clarify the needs for the preliminary evaluation of the system and its management to fill the gap of network system in flexibility.