Abstract
The demand to quick-delivery-izing and cost reduction in a system development project is increasing increasingly with acceleration of business speed. Although risk management is meanwhile fully performed and to carry out early detection and to cope with a risk is needed, it is diversified and the potential risk serves as a situation which is harder to detect. In this paper, it verifies about the methodology and validity for performing early detection of a risk..