2016 Volume 1 Pages 1-7
To move SSPS project forward successfully, what should be done now? Results of the case study of world successful frontrunner-type projects have shown the importance of a vision and innovation and criteria for leading a project to a successful conclusion. This paper will present a political vision for SSPS, cost and technology required for commercial SSPS, the future direction and problem presentation of SSPS development and useful tips for a successful development of SSPS.