2018 Volume 64A Pages 724-733
Recently, construction method for precast superstructures of port piers is required to minimize offshore operation after pipe driving. However, technical issues exist to connect precast concrete with steel pipe piles at the rigidity condition which is based on port design criteria. In this paper, “sleeve tube type” method is proposed to solve the connection problem of precast concrete and steel pipe piles without reducing workability. Mechanism focusing on the connection fixation of precast concrete and steel pipe piles is discussed through the cyclic loading experiment.