THE THERMAL AND NUCLEAR POWER GENERATION CONVENTION COLLECTED WORKS
Online ISSN : 2188-6148
Print ISSN : 2187-929X
ISSN-L : 2187-929X
Development and experience of the commissioning of Optimal Startup methodology for Steam Turbine
K. MiyazawaY. FukamachiK. YakushiT. Asanaka
Author information
JOURNAL FREE ACCESS

2015 Volume 11 Pages 22-27

Details
Abstract

Toshiba has developed and applied the optimal startup methodology to overseas power plants and domestic power plants to match the needs shortening of the startup time of a steam turbine generator. Toshiba reports the optimal startup methodology and some experiences at the commissioning stage in the domestic power plants.

Content from these authors
© 2015 Thermal and Nuclear Power Engineering Society
Previous article Next article
feedback
Top