2015 Volume 11 Pages 22-27
Toshiba has developed and applied the optimal startup methodology to overseas power plants and domestic power plants to match the needs shortening of the startup time of a steam turbine generator. Toshiba reports the optimal startup methodology and some experiences at the commissioning stage in the domestic power plants.