Tetsu-to-Hagane
Online ISSN : 1883-2954
Print ISSN : 0021-1575
ISSN-L : 0021-1575
Regular Article
An Optimization for Ore Stockyard Layout Operation Schedules Using Multi-Start Greedy Algorithm
Akira Kumano Yusuke YoshinariOsamu YamaguchiToru Miyazawa
Author information
JOURNAL OPEN ACCESS FULL-TEXT HTML

2023 Volume 109 Issue 11 Pages 857-864

Details
Abstract

We have developed an optimal scheduling method for the highly efficient management of multiple stockpiles of iron ore in the stockyard to significantly improve both yard logistics and the operational stability of steelworks.

The ore stockyard layout problem is to make inventory schedules for the purpose of cost minimization under several constraints such as uptime of facilities. While the number of stockpiles generally must be minimized for efficiency, excessive minimization can raise the risk of undelivery of iron ore if the required transport equipment become unavailable due to daily maintenance or a mechanical problem. The key, therefore, is to devise a plan that realizes both efficient yard operations and stable steelworks operation.

In response, we developed Stockpile Layout Planner which optimizes yard operations by creating ideal plans for up to several months with multi-start Greedy based algorithm that completes complicated logistical calculations in less than one minute. The new method ensures that such logistics are handled efficiently to realize highly stable ore management.

Fullsize Image
Content from these authors
© 2023 The Iron and Steel Institute of Japan

This is an open access article under the terms of the Creative Commons Attribution-NonCommercial-NoDerivs license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
Previous article Next article
feedback
Top