Tetsu-to-Hagane
Online ISSN : 1883-2954
Print ISSN : 0021-1575
ISSN-L : 0021-1575
The Development and Operation of Coke Dry Quenching with Double Flues
Ryuichi NAKAJIMANobuaki KONISHIFukio KUWADAKazutoshi MATSUMOTOYoshio TANITakaaki KIMURAToshiharu MATSUDA
Author information
JOURNAL OPEN ACCESS

1988 Volume 74 Issue 6 Pages 970-977

Details
Abstract
A latest CDQ has been installed at No. 4 coke oven in Fukuyama Works.
CDQ in Fukuyama has been designed on the basis of the operational experience gained over the years at Keihin Works. It is an effective facility which has a production rate of 110 t per h and incorporates with developed equipments such as a multi-stage flue, a rotating coke bucket and a multi-function turbine. The commercial operation was started in February, 1986. Since then, this CDQ facility has been operating successfully and contributing to energy savings in Fukuyama Works.
Content from these authors
© The Iron and Steel Institute of Japan

This article is licensed under a Creative Commons [Attribution-NonCommercial-NoDerivatives 4.0 International] license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
Previous article Next article
feedback
Top