Tetsu-to-Hagane
Online ISSN : 1883-2954
Print ISSN : 0021-1575
ISSN-L : 0021-1575
Development of Expert System for the Hot Strip Mill Draft-scheduling
Shitoshi MURAKAMITakato FURUKAWAAkio KODOIHiroshi UMEDAYukihiko OKAZAKI
Author information
JOURNAL OPEN ACCESS

1993 Volume 79 Issue 3 Pages 339-344

Details
Abstract
Draft-schedule in hot strip mill is made by the computer automatically with theoretical model. But in some cases, especially in case of material with high deforming resistance or thin gage material, supplemental operater's manual operation is needed to cope with the higher level problem, such as the transversal movement in the direction of strip width or the strip shape fluctuation between the stands.
So we introduced the expert system in the finishing mill set-up system at No.2 hot strip mill in NKK Fukuyama Works to ensure the fully automatic computing at the last stage. In this system, we summarized the operator's know-how to avoid the above mentioned higher level problem in two major control items. One is the planning to vary the load distribution over the stands in one cycle, and the other is the restriction of main motor current distribution over the stands and roll gap difference between the neighboring stands.
In a feasibility test, the prototype system was 90% applicable to the real process, and we have developed the real-time guidance system.
Content from these authors
© The Iron and Steel Institute of Japan

This article is licensed under a Creative Commons [Attribution-NonCommercial-NoDerivatives 4.0 International] license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
Previous article Next article
feedback
Top