Production Test of High-carbon Ferromanganese Using a Shaft Type Furnace with Coke Packed Bed Injected with Highly Oxygen Enriched Air and a Large Quantity of Pulverized Coal
Yasuo KAMEITomio MIYAZAKIHideyuki YAMAOKA
Author information
JOURNAL OPEN ACCESS

1993 Volume 79 Issue 4 Pages 449-455

Details
Abstract
High-carbon ferromanganese has been produced by electric arc furnace in Japan. But its production cost has increased because of a speedy rising of electricity cost and Japanese ferromanganese has lost competitiveness in the international market. So, for the purpose of decreasing its production cost, high-carbon ferromanganese production tests (production rate = 1. 9-4. 3t/d) were performed using a melting test furnace with coke packed bed injected with highly oxygen enriched air and a large quantity of pulverized coal. Moreover the operation indices of a commercial plant of 170t/d in production capacity were estimated by heat and mass balance model, and following results were obtained.
1) In this test, high-carbon ferromanganese of [Mn] = 75% was produced stably using the coke blended with 56% non-coking coal, with coal rate of 1502kg/t, coke rate of 1087kg/t and productivity of 3.11t/(d·m3).
2) The total coal consumption of the commercial plant of this method is estimated to be less than that of the blast furnace in spite of higher fuel rate because a large quantity of pulverized coal is used in this process. Through these investigations, this process seems to have a prospect of being available as a ferromanganese production process instead of electric furnace method.
Content from these authors
© The Iron and Steel Institute of Japan

This article is licensed under a Creative Commons [Attribution-NonCommercial-NoDerivatives 4.0 International] license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
Previous article Next article
feedback
Top