Journal of Structural and Construction Engineering (Transactions of AIJ)
Online ISSN : 1881-8153
Print ISSN : 1340-4202
ISSN-L : 1340-4202
DEFORMATION PREDICTION OF SUBWAY SHIELD TUNNEL DURING EXAVATION WORKS
Yoshikazu ISHIIMamoru FUJIIAkihiro IWATAHaruo KOBAYASHIHiroaki SENOO
Author information
JOURNAL FREE ACCESS

2009 Volume 74 Issue 639 Pages 821-829

Details
Abstract
We proposed a simple method that estimate displacement of shield on excavating above shield and verified this method by two results that were measured under different ground structure and different plan of excavation. We get a few opinions by this verify and refer as follows.1) The shield displacement is predictable in two-dimension elasticity FEM analysis that considers the ground rigidity decrease by the excavation in the direction of the axis line and the decrease by the excavation is from initial rigidity obtained from PS logging. The bottom of decrease area should set as bottom of pressure bulb (σz=0.1p). 2) Value of shield displacement is estimated as that of ground at bottom of the shield.3) The three-dimensional effect of the excavation plan that have the longer side in the direction of the axis line is estimated multiply α (Ratio of analytical result in direction of axis line of digging center and analytical result in direction of crossing) by the analytical result in the direction of the axis line.4) The shield displacement is estimated by decreasing the ground rigidity the area modeled pressure bulb (σz=0.1/p) when the final excavation.
Content from these authors
© 2009 Architectural Institute of Japan
Previous article Next article
feedback
Top