PRODUCTION ANALYSIS OF PRE-CAST CONCRETE CONSTRUCTION : (Part 3) Man-hours involved in production of pre-cast concrete components in some peculiar production systems and of some particular types of components, and man-hours involved in steel unit assembly
SHIGERU WAKAYAMAKAZUO GOTOMAKOTO YOSHIOKA
Author information
JOURNAL FREE ACCESS

1974 Volume 226 Pages 21-27,102

Details
Abstract
This is the third report of Production Analysis of Pre-cast Concre Construction. In the former reports we stated : 1) the purpose of this study. 2) the explanation of production analysis on building construction. 3) A detailed method of analysis And we also reported the amount of man-hours of usual pre-cast concrete components in relation to their different forms. In this report we analyze the man-hours involved in the production of pre-cast concrete components in a flow line production system and a battery-type production system in an effort to study the difference in production methods. Secondly, we report on the man-hours in the production of some particluar form of components including, three dimensional components, cartain-walls, ribbedslabs, staircomponents. Thirdly, we report on the man-hours in volved in the assembling of steel units which is to be included in th pre-cast concrete components.
Content from these authors
© 1974 Architectural Institute of Japan
Previous article Next article
feedback
Top