2006 Volume 12 Issue 24 Pages 43-48
Law for the recycling of construction materials put demolition work under an obligation to do preservey before the work, and to estimate the discharged construction waste. However, generally the period gave to preservey is very short. This report shows preservey system developed by the authors and the document of demolition work (Total floor area: 34,165m^2).