Abstract
Experiments were carried out to examine the anchorage of column rebars for RC buildings with pilotis floor where the column depth greatly reduces. All the specimens failed in raking-out before the flexural yielding. It is important to avoid greatly reducing the column depth. When it is unavoidable to reduce the column depth; to transfer the column stresses to other members surely, note that: (1) the depth of beam over the pilotis floor should be as large as the column rebars are developable, (2) the beam bottom should be reinforced longitudinally enough.