TOP-DOWN CONSTRUCTION USING PRECAST ULTRA HIGH STRENGTH CONCRETE BASEMENT COLUMNS AND QUALITY CONTROL OF ACTUAL BUILDING OPERATIONS
Keiki YAMAMOTOTetsuji MIYATAHiroshi JINNAIAtsushi HATTORISatoshi WATANABETomohiro TERASHIMARieko TERAUCHIKatsuhiko IKEDA
Author information
JOURNAL FREE ACCESS

2009 Volume 15 Issue 29 Pages 21-26

Details
Abstract
The top-down construction method using pre-cast concrete for basement columns is more effective in improved quality of concrete, shorter construction time and economy of labor compared with traditional top-down method, requiring no column construction under the ground floor after excavation. This paper first describes the production planning and the implementation of the top-down construction method applied to an actual high-rise building using pre-cast ultra high-strength concrete with a design strength of 100 MPa for basement columns. The paper then proceeds to report on the results of the quality control tests of the high-strength concrete.
Content from these authors
© 2009 Architectural Institute of Japan
Previous article Next article
feedback
Top