Abstract
The report on the measures of cremation capacity building of the crematorium who have not received the City planning decision. How it was refurbished in response to the residents of measures and construction funding problem. The author makes a basic design, and I do anecdotal reports of Niitsu Saijyo of Niigata City that made the construction supervision of the cremator construction. I discussed the benefits and challenges of the time of large-scale renovation.