Abstract
We developed a system that can send orders from outside controller to the multi-split type air-conditioning system (EHP). Using this system, optimal operation control method for EHP was developed and installed into an office building. This control method improves COP of the EHP and reduces the excessive operation of the outside air processing unit. In this report, we installed this control method into an office building and verified its performance comprehensively.