2018 Volume 24 Issue 58 Pages 1027-1030
This report presents studies on the construction performance of connecting buckling restrained braces in RC frames and the decrease in the tension of anchor PC rods. First, a construction test considering actual building conditions was carried out. From the test result, problems in actual construction were identified and the possible solutions were examined. In addition, long-term measurement of the tension in the anchor PC steel rods was conducted for one year. From the results of the long-term measurement, the decrease in the tension of PC rods was analyzed, and the method for designing anchor PC rods was suggested.
Ethical standards of the publisher (‘Ethical Standards Concerning the Peer Review for the Presentation of Architectural Transactions and Works’)