2019 Volume 25 Issue 61 Pages 1045-1049
Concerning “Construction of Remaining Some Prop by Received Three-Layer” applicated in concrete formwork, questionnaire survey had been carried out about the way of structural calculation for formwork shoring and actual state of requester building. We have summarized results of surveys about structural calculation outline. And summarized results of surveys about building part necessary for structural calculation and defining required concrete compressive strength.
Ethical standards of the publisher (‘Ethical Standards Concerning the Peer Review for the Presentation of Architectural Transactions and Works’)