2021 Volume 27 Issue 65 Pages 48-53
The method for construction management for construction woks of polyurethane waterproofing membrane being improved in repair work site was described in this research. The effectiveness of the method was confirmed by being applied to subsequent repair works. To check the quality of repair work of polyurethane waterproofing membrane, thickness of membrane was verified. The aging condition was also inspected for ensuring aged membrane.
Ethical standards of the publisher (‘Ethical Standards Concerning the Peer Review for the Presentation of Architectural Transactions and Works’)