2022 Volume 28 Issue 69 Pages 953-957
This study analyzed the operational status of 18 districts to which the tsunami reconstruction base development project established for the reconstruction after Great East Japan Earthquake was applied. As a result, the following three points were mainly clarified. Of the 7 districts that were gradually expanded, 5 districts including the land readjustment project were 10ha or less, and 5 districts with an applicable area of 5ha or less were slow to introduce the project and only public facilities were developed. 7 districts with more than 10ha were not merged with the land readjustment project except Rikuzentakata City.
Ethical standards of the publisher (‘Ethical Standards Concerning the Peer Review for the Presentation of Architectural Transactions and Works’)